Customization: | Available |
---|---|
After-sales Service: | Video and Manual Offer |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Equipped with PLC panel control, automatic tube chamfering machine can be devided into vibrating plate and manpower discharging. Our YE-Z3 Automatic tube chamfering machine' feeding is controlled by a vibrating plate or plunger lift. Various configuration possibilities allow for a variety of applications to be double head chamfer with length from 10 to 300 mm. An optimal combination of proven state-of-the-art components results in outstanding production rates.
project | Technical parameters |
The power supply voltage | 380v 50Hz |
The external air pressure | 0.6-0.8 MPa |
The work piece length | 10-300 mm |
Machining diameter | pipe tube ∅3-∅40, bar tube ∅3-∅40 |
Processing speed | Processing times 20 to 40 times per minute |
The length of tolerance | ±0.05 mm |
The motor power | 1.5 KW-2 |
Spindle speed | 2500-2800 RPM |
Feeding way | vibration disk or plunger lift |
Processing range | Suitable for copper tube and aluminum tube . Inside. Outside. Two head chamfering flat bar |
Machine size/weight | 2200 mm * 1100 mm * 1620 mm / 600 kg |
Q: How to choose the pipe/tube cutting machines?
A: You have to inform us following details:
- Pipe Outdiameter Range
-Wall Thickness Range
- The Pipe Material
- Cutting Angle
-Cutting Length
- Tube Original Length
Q: What delivery time for standard machine?
A: Within 35 working days after received advanced payment.
Q: What about your machine warranty?
A: One year warranty after machine reached customer's workshop.And will responsible for lifetime maintenance
Q: What about delivery terms and payment terms?
A: Delivery terms: 50% deposit, 50% paid before shipment.FOB Ningbo, ClF your portPayment Terms: T/T, L/C
Q: How about your service?
A: Before Sales Serive:
1. We will confirm the right model according to the offered pipe inforamtion.
2.Welcome to visit our factory and workshop before you place an order.
After Sales Service:
1. We provide manual,detailed machine installation,commissioning video for operate machine.
2.We provide free installation,commissioning and training at our factory.
If you need enginer go to your factory for machine training, air tickets,food,hotel, local transportation, engineer's salary should be at your account.
3. Any problems on machine,we will reply you by email/tel or other online contact within 24 hours.